Our Advantages

BS&W

  • Tank downtime minimized as it remains in service during the entire desludging phase
  • Up to 95% of all hydrocarbons are recovered from the sludge
  • Minimization of the final waste to be disposed
  • High QHSE standards: no man operation on the roof of the tank and minimal confined space entry
  • No need for secondary tank
  • No need of oil batches, the product inside the tank can be used to disperse the sludge
  • Process can be applied whichever is the sludge level and the oil level without extra cost and extra time
  • No need to remove the legs or to tap the roof
  • No need to use nitrogen for nitrogen blanketing
  • Uniform landing of the floating roof avoids mechanical troubles
  • Mechanical modules can be left installed for future cleaning operations and to prevent sludge accumulation
  • Zero emission of VOC’ s during all operations